Marine Boiler Service

Steam drum repair Machining tool for boring the penetration for renewal and welding of new down comer tube studs


Renewal of furnace floor tubes

Prefabricated main bank tubes packed in crates for sea freight transport to the ship in the Arabian Gulf

Auxiliary boiler for container ship, fabrication of entire pressure parts as per sample for replacement on board during a five days regular docking

Prefabrication of economizer section

Boiler repairs Rebuilding of an exhaust gas boiler with prefabricated sections of finned tubes to minimize overall repair time

Exhaust gas boiler fabrication Plain tube type ehaust gas boiler, weight 60 tons, during completion. The unit was designed and made to replace a totally burnt exhaust gas boiler of finned tubes on same outer dimensions and connections for a turnkey and easy refit

Exhaust gas boiler TT - AG 3.7 Plain tube type Evaporation 3.700 kg/h Working pressure 9.0 bar

SH retubing Fitting of prefabricated super heater tubes, annealing of welds immediatelly after completion of welding and x-ray testing

Boiler Components Fabrication of a SH outlet steam manifold for the main boiler of a steam driven passenger ship. The new manifold was made of solid material 13 CrMo 4 4 DIN 17175 (1% Cr - 0,5% Mo steel forging), as welded construction on top urgent delivery terms to replace the damaged original manifold of cast steel material, class LRS.
Back | Industrial Boilers
|