Maintenance at RWE power station Ibbenbüren

Turbo-Technik is presently carrying out modernization and maintenance work at the RWE controlled coalfired 770 MW powerstation Ibbenbüren, Westfalia, built in 1981.

Part of the work consists of demounting 44 shields in the superheater section at 64 m height and remounting the new shields of VM12 material that have been prefabricated in our workshop. The shields have a total weight of 80 tons and involve 17000 meters of boiler tubes with approximately 3500 welding connections. Further work involves the overhaul of 32 burners of the boiler and cladding of a substantial surface.